The area near the bus station in Krnov is set for a CZK 123 million makeover

Publisher
ČTK
15.11.2026 13:15
Czech Republic

Krnov

Krnov – The car park near the bus station in Krnov, in the Bruntál district, is set for revitalisation next year, bringing more greenery, better rainwater management and a clearer traffic layout. The project includes planting around 50 trees and creating 154 parking spaces. The estimated cost is CZK 123 million including VAT. The start of work in 2027 is conditional on securing a grant from European funds, city spokeswoman Dita Círová told the Czech News Agency (ČTK).

"The main idea behind the project is to strengthen blue-green infrastructure, meaning introducing as much vegetation as possible into public spaces and capturing rainwater right where it falls," said city architect Marek Juránek. According to him, 95 per cent of the car park's surface currently prevents rainwater from soaking into the ground. After the improvements, infiltration areas should make it possible to capture all rainwater where it falls.

In addition to trees, the site will gain planted strips and perennial flower beds. Traffic arrangements will remain largely unchanged, but a pedestrian path will divide the car park into two zones. "The smaller section near the apartment buildings will be designated for long-stay parking, mainly for local residents. New planting will also separate it from the surrounding residential buildings. The larger section will provide short-stay parking spaces," the spokeswoman said.

The car park will offer a total of 154 spaces, around eight fewer than at present. However, individual spaces will be wider and easier to manoeuvre into. New features will also include spaces for quick passenger drop-offs and pick-ups, as well as parallel parking spaces for vans and tradespeople's vehicles. These will be located along the pedestrian path by the park.

"The project also includes new street lighting, improvements to pedestrian routes, a bike-sharing station and preparations for six electric vehicle charging spaces," she said. The estimated cost of the revitalisation is CZK 123 million including VAT. The project has been recommended for support from European funds up to a maximum of approximately CZK 69 million. In September, the city council approved funding for the project from budget allocations for 2026 and 2027.

The city is now preparing a public tender to select a contractor. It plans to launch the tender process before the end of this year, with work itself expected to begin in 2027. However, implementation depends on securing the European grant.

The English translation is powered by AI tool. Switch to Czech to view the original text source.
0 comments
add comment