Ekom Administrative Building, Piešťany

Ekom Administrative Building, Piešťany
Address: Priemyselná 18, Piešťany, Slovakia
Investor:EKOM s.r.o.
Project:8. - 12.2016
Completion:4.2017 - 1.2018
Area:1713 m2


Award: VISIO 2020 Award - for the most outstanding achievement in sustainability in architecture and construction in 2018/2019

Ekom Office Building and Parking Garage

How a company presents itself to the outside world matters. It shapes its public image for years to come. People often associate the architecture of a company’s headquarters with its identity. EKOM, a manufacturer of environmentally friendly compressors based in Piešťany, was aware of this from the outset. This was one reason why it worked closely with the architects throughout the design and construction process. The result reflects a comprehensive architectural approach, from urban planning and architecture down to interior details. The architects and the client also found common ground in another area: the building’s environmental standards, which reflect the company’s values and priorities. The result is architecture that represents the company, but without being obvious or ostentatious. There is little room for that, particularly in an industrial zone on the outskirts of town. The architecture is strictly based on functional and structural logic. Decoration and cladding are largely replaced by exposed concrete and a transparent façade that allows visitors to see inside the building. However, this approach places considerable demands on design and construction planning, as any mistakes cannot easily be concealed. In this case, however, there seems to be nothing to hide.

Building and Layout

The three-storey office building, with its almost square floor plan, is punctuated by an open atrium extending through its full height. A four-storey parking garage for employees is directly connected to the office section. This unconventional solution freed up ground-level space for the company’s future expansion. The parking garage connects directly to the individual floors of the office building and also provides a covered pedestrian passage to the future assembly hall. It also houses the plant rooms required for the office building, allowing for a more generous office layout.

The offices and meeting rooms are complemented by relaxation and social areas, kitchenettes, a fitness area with a higher ceiling, and training and presentation spaces on the ground floor. The layout made it possible to create an open, interconnected working environment, not only in terms of spatial arrangement and the building’s operation, but also in terms of social interaction. The long-term flexibility of the spaces is ensured by the use of beamless floor slabs.

As the new office building is the headquarters of a manufacturing company, exposed concrete and glazed walls with anthracite-coloured frames dominate the interior. The office spaces are also designed without visible building services, such as radiators or intrusive ceiling installations. The material palette is pared down to neutral white walls, boldly coloured carpeting and an exposed concrete ceiling.

Large-format tiles or rubber flooring are used in the communal areas. Service installations are concealed behind a perforated plasterboard suspended ceiling or acoustic panels. In the corridors surrounding the atrium, a line runs along both the floor and ceiling, creating a distinctive wayfinding feature and emphasising the perspective of the space. The wooden wall cladding is pleasant to the touch and has good acoustic properties. Nevertheless, glass and transparency remain the dominant themes in the overall impression of the interior. The wooden cladding panels allow for customised surfaces, while also serving as writable or projection walls.

New Trends in Office Interior Design from an Architect’s Perspective

“Today, the starting point for a design should be the creation of a healthy working environment, which is about more than adequate air exchange or thermal comfort. The design should be strongly influenced by the type of company and the team and individuals who will use the spaces. Designing an interior for an established company with an even spread of generations is very different from designing for young users. Seemingly design-led spaces in the style of 'Google interiors' may not always be appropriate or functional, explains architect Adam Cifra, continuing: It is important to have different zones within the space, opportunities to walk around or move to a different type of seating. So-called ‘third places’ are emerging, where people have an opportunity to unwind a little. Coworking and desk sharing are a significant step forward in the evolution of offices. However, shared use of the working environment needs to be carefully considered to avoid artificially creating shared spaces that people will not subsequently use. It is also important to remember that people tend to personalise their surroundings, which introduces a degree of visual disorder into the space. Yet people, too, are part of the interior and represent the company in their own way.”

The Building’s “Green” Features

The client’s environmental outlook allowed the architects to design an ultra-low-energy building (A1), despite the increased costs. This was achieved through appropriate orientation and the use of technologies such as thermal activation of the building’s concrete core, ceiling panels for radiant heating and cooling of communal areas, ventilation with heat recovery, use of the thermal storage capacity of exposed concrete structures, interior and exterior LED lighting, and an intelligent external shading system.

Dew-point sensors, assessments of whether conditions are suitable for manually opening windows, and glare sensors on individual façades are used to optimise the building’s operation. Various heating and cooling options were examined as early as the conceptual design stage. A static calculation of the ceilings’ cooling capacity using simulation software, a dynamic calculation of the building’s heat gains and losses, and a simulation of energy flows within the building were carried out. The building is also prepared for the use of renewable energy from groundwater through a heat pump system. The use of 3D modelling across multiple disciplines enabled better coordination, particularly during the preparation of construction documentation.

DELTA Projectconsult